Monday, April 6, 2009

Day One of Installation: Room Is Built!

Got up fairly early, pumped out some more promotion then down to my studio to crank out on more of these pieces. Got a lot of the detail work painted, two frames painted and loaded my little truck up with 11 doors (That shit is heavy.)

Loaded the doors in to Twilight one by one. Figured out the order and went to town on the installing.  Thanks to Erin's help it was fairly easy to get it all put together.  Now back to getting the rest of the wood installations completed and the windows done.

Oh, I'm nearly at a 1,000 individual hand cut out, and hand wheat pasted one by one boxes.  Serious... that is a lot of boxes for this show.




No comments: